Overall overhaul of outdoor steel billboard structure
1. fasten the anchor bolts

After the completed the hoisting, it needs to fasten again during 3-8 months.
2.Check the welding place of pole arm and pole to avoid desoldering.

3. Check the welding part of pole arm,

4.Check the background of billboard.

Previous:Overhaul of outdoor billboard
Next:Qianxi attend 2017 SGI Dubai these three days

After the completed the hoisting, it needs to fasten again during 3-8 months.
2.Check the welding place of pole arm and pole to avoid desoldering.

3. Check the welding part of pole arm,

4.Check the background of billboard.

Previous:Overhaul of outdoor billboard
Next:Qianxi attend 2017 SGI Dubai these three days
Our Target:
Try our best to be an outstanding outdoor advertising product manufacturer.
Our Mission:
Benefit more customers,and develop ourselves.